Park Farm

After completeing a number of successful contracts for BAM Nuttall, Carver was extremely pleased to secure the Park Farm Project. The project consisted of 2no. Train bridges running parallel to each other each extending up to 6m long and 3.5m in width replacing an existing through deck bridge which runs over a country lane in Sussex.

As part of the package Carver also manafactured walkways fixed to the outside of the structure. The steel structure was fabricated throughout December 2013 and January 2014. In Febuary 2014 the bridges were painted, filled with concrete and weather sealed to the customer's specfication. The installation was completed in March 2014